Projects of 2008 

Batumi Sea Port 

Status: Completed
Client: Batumi City Hall
Start date: May, 2008
Completion date: December, 2008 
Working volume: 3 000 m2

PROJECT DESCRIPTION:  

CIC Group Construction Company completed rehabilitation works of the Batumi Sea Port building.

The roof was replaced with a colored tint, windondows and glass-fittings were replaced, doors and windows were made of metalloplastic material, the façade was plastered and fully covered with Caparol paint. Additionally, internal engineering works were made which included engineering systems (electricity, water, sewerage, heating, air conditioning).