Batumi Sea Port
Status:
Completed
Client: Batumi City Hall
Start date: May, 2008
Completion date: December, 2008
Working volume: 3 000 m2
PROJECT DESCRIPTION:
CIC Group Construction Company completed rehabilitation works of the Batumi Sea Port building.
The roof was replaced with a colored tint, windondows and glass-fittings were replaced, doors and windows were made of metalloplastic material, the façade was plastered and fully covered with Caparol paint. Additionally, internal engineering works were made which included engineering systems (electricity, water, sewerage, heating, air conditioning).