Projects of 2009 

Batumi Drama Theater

Status: Completed
Client: Batumi City Hall
Start date: February, 2009
Completion date: October, 2009
Working volume: 5 000 m2

PROJECT DESCRIPTION:

CIC Group Construction Company completed works of gold plating of "Ilia Chavchavadze State Drama Theater" in Batumi.

Complete reconstruction works were undertaken and the facade was fully restored, the capitals and bases on the facade of the building were arranged, new barrels were arranged, mosaic floor and stairs were made and also colored mosaic stained glass showcases were built.


Building at 18/34 M. Abashidze Str.

Status: Finished
Client: Batumi City Hall
Start date: February, 2009
Completion date: September, 2009
Working volume: 1 400 m2

PROJECT DESCRIPTION:

CIC Group Construction Company completed reconstruction and rehabilitation works of a building located in the historical district, at 18/34, M. Abashidze Str. Batumi.

The 1st floor was built, domes were arranged and were adorned with zinc-titanium sheets, facade finishing works were made which included doors and windows. New architectural details were arranged and the facade was painted with Caparol paint.


Building on Rustaveli

Status: Completed
Client: Batumi City Hall
Start date: April, 2009
Completion date: September, 2009
Working volume: 1 000 m2

PROJECT DESCRIPTION:

CIC Group Construction Company completed reconstruction and rehabilitation works of the building located in the historical district at 7/2, Rustaveli Str. Batumi.

The facade reconstruction works were made, windows were replaced, roofing works were done using roof copper sheets, decorative metal ladder was constructed.