Projects of 2017-2018

Hotel Complex in Lopota Lake

Status: Completed
Client: Lopota LTD
Start date: April, 2017
Completion date: November, 2018

PROJECT DESCRIPTION:

CIC Group Construction Company performed construction and finishing works for the Lopota hotel complex.

The hotel complex, namely, 3 blocks of the hotel, the Swedish restaurant, the Chateau, the administrative building and the pool were built. The project was fully completed, including structural and architectural works. External sewerage network and the wastewater treatment plant were constructed.


Event-Hall "Republic" and Restaurant "Andropov's Ears"

Status: Completed
Client: Iveria Center LTD
Start date: January, 2017
Completion date: January, 2018
Working volume: 5 000 m2

PROJECT DESCRIPTION:

CIC Group Construction Company completed the architectural and setup works of the Republic and Andropov's Ears restaurant in Tbilisi.

The interior works of the building were performed in accordance with a project created by foreign designers. At -1, 0, +1 and +2 levels an event-hall was arranged, and the fish restaurant Andropov's Ears was built on the +3 floor. Oak parquet, Troldekt acoustic panels and Caparol paint were used as finishing materials. Tubular partitions and handrails were also arranged and the columns were finished using darkened metal sheets and mirrors.

As for the fish restaurant, a false floor was installed. The floor was finished using granite tiles and parquet. The deck on the terrace was finished using Iroko wood material. Podiums were arranged inside the restaurant, and partition walls were constructed of Belgian bricks using different kinds of ornament setups. A wooden decorative ceiling was built. Many types of technology and various expensive materials were used. The bar was built using pink onyx, special lighting, it was finished using stainless materials, etc.


Evex

Status: Completed
Client: Evex LTD
Start date: February, 2018
Completion date: April, 2018
Working volume: 820 m2

PROJECT DESCRIPTION:

CIC Group Construction Company performed façade refurbishment works of the Evex company building on Kavtaradze Street in Tbilisi.

Finishing works of facade were performed using alucobond panels. Two kinds of the panels - one with a wooden texture and the other with a dark gray color were used. A canopy with the size of 4 m X 9.5 m with its waterproofing system was constructed along the facade of the building.


Multilevel Complex on B. Kvernadze Street

Status: Completed
Client: Tiflis Business Center LTD
Start date: January, 2017
Completion date: September, 2018
Working volume: 6 000 m2

PROJECT DESCRIPTION:

CIC Group Construction Company performed monolithic reinforced concrete works for the structure of a multi-storey building.

A 6 storey reinforced concrete building frame was built.