Projects of 2014

The Twelfth Berth of Poti

Status: Completed
Client: Corporation "Poti Sea Port"
Start date: January, 2014
Completion date: December, 2014
Working volume: 23 854 m2

PROJECT DESCRIPTION:

CIC Group Construction Company executed the reconstruction works of the twelfth berth and container yard of Poti Sea Port.

For the container terminal of the Poti Sea Port, two types of reinforced concrete pavements were constructed:

1. High duty pavement of the concrete reinforced with rebar and steel fibres; the thickness of the pavement - 39 cm; area – 10 629 m2;

2. Medium duty pavement of the concrete reinforced with rebar and steel fibres; the thickness of the pavement - 25 cm; area – 13 225 m2.

Within the project the quay for Berth 12 equipped with full furniture (bollards, fenders, ladders, etc.) was constructed, also all systems for the container terminal (electricity, drainage, fire protection, lighting masts, etc.) were constructed; the existing railway section to the berth was replaced and a new checkpoint was constructed.


Exhibition Center

Status: Completed
Client: Natural Person
Start date: May, 2014
Completion date: October, 2014
Working volume: 2 120 m2

PROJECT DESCRIPTION:

CIC Group Construction Company completed construction works of the exhibition center located between Bartskhana and Korolistskali rivers.

Different works such as structural, spatial steel structural works alongside with the works of reinforced concrete slabs on the roof at +3.9 level were performed for the Exhibition Center. The structure of the building was fully finished and painted using Caparol paint, aluminum stained-glass window were installed at 0.00 level, the pavement of imprinted concrete was arranged around the building.


Restoration works for the seashore promenade for pedestrians
Customer — Batumi City Hall